High Quality Indoor Waste Bin Cup Plastic Part, Indoor Waste Bin Cup Plastic Mould, Indoor Waste Bin Cup Plastic Moulds Suppliers in China

Home > Products > plastic parts > Indoor Waste bin cup plastic parts

Indoor Waste bin cup plastic parts

  • Indoor Waste bin cup plastic parts
  • Indoor Waste bin cup plastic parts
  • Indoor Waste bin cup plastic parts
  • Indoor Waste bin cup plastic parts

Indoor Waste bin cup plastic parts

    Payment Type: L/C,T/T
    Terms of Trade: FOB,CFR,CIF,FCA
    Min. Order: 1set Set/Sets
    Delivery Time: 65 Days
    Packaging: Wooden box
    Productivity: 500000shots/mold life
    Brand: Ceeto
    Transportation: Ocean,Air
    Place of Origin: China
    Supply Ability: 20pcs/month
    Certificate: ISO
    HS Code: 8480790090
    Port: Ningbo,Shanghai

Basic Info

Model No.: CT-10531

Product Description

Indoor Waste bin cup Plastic Parts can be used household industry and any commercial indoor places, we have been making a lot of indoor garbage bin plastic moulds with rich experience and export plastic garbage bin moulds to all over the world. Indoor garbage bin plastic product with tap style or with lid style, no matter which kind of garbage bin, we are able to design and manufacture moulds for your company. Indoor garbage bin plastic injection material normally is applied PP, HDPE, the recycled material also can be used if the customer has any requirements. Plastic garbage bin mould design can be made as per your technical specifications.


company building


machining workshop


Starting mould design for indoor garbage bin, we need to communicate with the customer about the following items:


  1. Freeze product 2D drawing and 3D model
  2. Material shrinkage rate definition
  3. Customer injection machine technical specification

Indoor garbage bin



Indoor garbage bin mould design stage, we provide the customer with the following items:


  1. DFM report ( Definite parting line, gate location, and size, ejection location, etc. )
  2. Moldflow analyses
  3. Mould 3D full design


Mold flow



When Ceeto receives product final design from customer to start project, the Program Manager will be the main